8 March 2026
A season inside the Aktepe tunnel project

The Aktepe iron mine entered expansion in Q2 2025: 2.4 km of new gallery, 12-month target.
Fleet
- 2 × Titan BPT24 · personnel transport
- 1 × Titan DK16 · waste haul
Service calls
Three callouts in the first four months. Two hydraulic hoses, one electrical harness. All resolved within 24 hours.
