14-year Wetspray rebuild
An IS21 delivered in 2011 came back in 2024 with 14,200 hours. Stage-V driveline, fresh CAN harness, twelve-month warranty.
We build lasting trust by delivering tailored solutions for challenging projects across diverse geographies.
Projects Built on Trust and Proven Expertise
Operation
Country
An IS21 delivered in 2011 came back in 2024 with 14,200 hours. Stage-V driveline, fresh CAN harness, twelve-month warranty.
Wetspray IS21, a BPT24 personnel carrier and a DK16 dumper commissioned in 90 days for the Aktepe extension. Operator training on-site.
A BKOS front-basket platform and a DK16 dump fleet configured for 38 °C ambient and dust shielding. Local engineer trained for tier-1 service.
Two operator generations, one service line. A Titan fleet on site since the mine opened, with parts to depot inside 24 hours.
Robotic wet shotcrete for a headrace tunnel. 10 m vertical reach kept the crew out of the spray cloud on every pass.
IS21 sprayers and BPT24 personnel carriers on a metro alignment. Wireless control and closed ROPS/FOPS cabins for round-the-clock shifts.
Shotcrete lining and DK16 muck haul through a narrow-drift road tunnel. Three steering modes kept the dumpers turning in tight sections.
A DK16 dumper fleet dimensioned for steep-grade ramps at altitude. Reinforced body, 12,000 kg payload, Stage-3A engine.
BKOS basket platforms for roof support and DK16 dumpers for development haul. One workshop, one spare-parts channel.
“We've worked with Titan since the year I started in this mine. Two operators have come and gone. The phone number hasn't changed.”
Operating Worldwide
