Fleet, engineered for the seam.

Four product families for underground mining and tunnel operations. Sourced and serviced from one team.

  • 4Product families
  • 22Countries on site
  • 1.200+Units in service
  • 25 yrOperating record

Design philosophy

Not for the showroom, engineered for the seam.

Every chassis is dimensioned for a 4.5 m drift section. Every bolt has a name. Before it leaves the workshop, every machine is tested on our 30 MPa hydraulic bench and in our −20 °C cold chamber.

One workshop, one phone. The engineer who drew the boom answers your service call. That structure has not changed in 25 years, and we don't plan to change it.

You reach the service points without stripping the cabin. Even fourteen years on, it feels like day one. Whoever drew the workshop knows why.
Operator · Algerian gold mine

Why Titan

Made for the seam, kept for life.

01

Designed underground

Every chassis is dimensioned for 4.5 m drift sections. We test in the seam, not the showroom.

02

Service-first geometry

Fuel filter, hydraulic block, harness: all reachable without dismantling the cabin. Even a fourteen-year-old machine still gets serviced like day one.

03

One workshop, one phone

Designed, built, rebuilt and supported from the same Ankara shop. The engineer who drew the boom answers your service call.

04

Stage-V driveline

Even torque, less heat. Cooling load down 18%, 24 kWh saved per shift.

05

CAN platform

Same harness, same language on every machine. If an operator knows the Wetspray, they know the BKT.

Workshop · Malıköy Anadolu OSB · Ankara
Datasheets
Need the full spec sheet, hydraulic schematic or dimensional drawing? We'll send the engineering pack.
Request datasheet